Projects
- Coating specifications for aerial structures, buried pipes, welded joints and hot-dip galvanized parts from Sempra Infrastructure.
- Specifications for the protection of structures of the Electricidad Águila de Tuxpan and Electricidad Sol de Tuxpan thermoelectric plants owned by Diamond Generating Company.
- Specifications for the protection of structures on land and offshore for Hokchi Energy.
- Specifications for the protection of aerial structures and buried pipelines owned and operated by Pan American Energy, Argentina.
- Specifications for the protection of LNG aerial structures Quintero, Chile.
- Preparation of work procedures for Cotemar.
- Preparation of work procedure for Demar.
- Preparation of work procedures for Rucsa.
- Preparation of work procedures for Lubosa.
- Preparation of work procedures for Especialidades en Turbo Maquinaria.
- Coating survey of the structures of the thermoelectric plants “Electricidad Águila de Tuxpan” and “Electricidad Sol de Tuxpan”, property of Diamond Generating Company.
- Integrity evaluation of the concrete slab of the cooling tower located at Termoeléctrica de Mexicali.
- Coating integrity analysis of various sections of gas pipelines owned by TC Energy.
- Coating survey on the structures of the new José Cuervo 1800 distillery.
- Integrity analysis of aerial structures for COGA Peru.
- Coating survey in the Veracruz Refining Terminal of Sempra Infraestructura.
- Evaluation of the degree of corrosion of structures located at the Costa Azul Energy LNG plant.
- Evaluation of the coating conditions of two ships for IMC Engineering SRL, Genoa, Italy.
- Coating survey of the coating of the San Isidro-Samalayuca project, property of Sempra Infraestructure.
- Coating inspection for companies such as IEFSA, Deemsa, Zeeco-Therme, GE Oil & Gas, Cameron, Lubosa, Demar, Especialidades en Turbo Maquinaria.
- Coating inspection for the SIAM project – PEMEX; structures manufactured by Cotemar.
- Coating inspection during the lining application on the fire water tank at Energía Costa Azul.
- Quality control during the demolition and casting of the new slab at Termoeléctrica de Mexicali.
- Inspection of the repair work on the structures of the new José Cuervo 1800 distillery.
- Quality control during the coating rehabilitation of a 12” FBE coated gas pipeline for Engie.
- Technical advice to GRTgaz through Bureau Veritas in the removal of the outer coating of the Los Ramones Sur II gas pipeline.
- Analysis of failure in an oil pipeline owned by Andes Petróleo, Ecuador.
- Analysis of failure in ethane pipeline owned by Gasoductos del Sureste.
- Expert witness for Tecnimont SpA in litigation vs. Al Ain Ahlia Insurance – Dubai, UAE.
- Expert witness in litigation between the Cartagena Refinery and Liberty Seguros, Colombia.
- Failure analysis of cracking in heat exchanger tubes TSK Group, Gijón, Spain.
- Failure analysis of the topcoat of 19 wind towers for DNV-GL in Honduras.
- Failure analysis of rusting in stainless steel equipment for Alfa Laval.
- Coating thickness analysis of in cadmium coated parts for Especialidades en Turbo Maquinaria.
- Failure analysis of the cracking in geodesic domes of fuel storage tanks.
- Failure analysis of gas pipeline field joint coating owned by a gas transportation company.